Installation schematic
![YENUO](https://images-na.ssl-images-amazon.com/images/G/01/x-locale/common/grey-pixel.gif)
installation steps:
1. Locate two horizontal lines at the installation positions on both sides of the cabinet, and fix the external fixed slide rails on the horizontal lines on both sides with screws; (note: the positioning on both sides must be parallel)
2. Fully extend the slide rail, press the inside of the rail to remove the buckle, and pull it out to separate it from the external fixed rail;
3. Fix the inner fixed rails with screws on both sides of the drawer, align the fixed rails in the middle, and then slide them in parallel;
4. The installation is complete.
Installation requirements: the installation space on both sides of the drawer must be 12.7mm * 2(1/2 inch* 2).