Feature

●All positive, negative and grounding buses installed, fully pre-wired
●Panels with meters include toggle switch for mounting up to 3 battery banks
●All hot, neutral and safety ground buses installed, fully pre-wired
●All circuit label positions are backlit on standard panels - No kit required


Description

All positive, negative and grounding buses installed, fully pre-wired Panels with meters include toggle switch for mounting up to 3 battery banks All hot, neutral and safety ground buses installed, fully pre-wired.