(1)Use the spring tool to stretch the 5.5" springs into correct places.
(2)Firstly, Install the opposite 4 springs as the step 1 showed,It is highly recommended to count the V-rings and frame spring holes
to drop the springs into correct holes.
(3)Follow the other steps.Every V-rings should be connected to a Frame hole with the spring.