Operating Steps
Turn on the electricity and add water.
1.The foot bath is laid flat on the ground.
2.Place the foot tub flat, press the middle of the foot tub bottom, and pull up the outer front of the foot tub.
(NOTE: PULL UP FROM THE FOOT TUB OUTSIDE, NO PULL THE CONTROL PANEL, OTHERWISE WILL DAMAGE THE MACHINE.)
3.After the front end is pulled, press down the middle of the foot tub bottom again, and then pull up the outer back end of the foot tub.
4.Rotate and push the support rod straight to the groove under the control panel. And add a proper amount of water.(It is recommended to add warm water at about 35 degrees to reduce the waiting time.)