CLEANING - Quick pre-clean of tough spots if necessary
- Wet cloth to remove contaminants
- Final wipe with dry cloth
|
PRIMING THE SURFACE - Apply primer, primer on a towel, followed by a dry towel
- Dauber bottle followed by a dry towel
- Foam brush
- Let dry before taping
|
TAPE APPLICATION - Start the tape at the edge of the surface and lay it down, applying constant pressure as you go.
- Remove the protective liner to apply the other substrate
|
APPLYING FINAL PRESSURE - Typically, this is achieved by the application of greater than 15 psi at the tape bond line.
|