Feature

●This kit is the custom treehouse hardware you will need to build a platform for a small-scale treehouse in 2 trees using our Tree Fort Treehouse Hardware System.
●(4) Tree Fort TABs
●(2) Tree Fort DUAs
●(2) Tree Fort SUA
●(4) Hex Nuts
●(1) Tree Fort TAB Install Kit


Description

Nelson Tree Fort TAB Installation Visual

Treehouse Attachment Bolt Step 1Treehouse Attachment Bolt Step 1

Treehouse Attachment Bolt Step 2Treehouse Attachment Bolt Step 2

Treehouse Attachment Bolt Step 3Treehouse Attachment Bolt Step 3

Treehouse Attachment Bolt Step 3Treehouse Attachment Bolt Step 3

TAB Install Step 1

After establishing TAB elevation and orientation, use the 13/16” Auger Bit supplied in the Tree Fort Install Kit to drill a level hole 8-3/4” into solid wood (excluding bark).

*Minimum Recommended Tree Diameter ~10"

TAB Install Step 2

Using the Forstner/Custom Pilot Bit supplied in the Tree Fort Install Kit, drill 3” into solid wood (excluding bark).

*Be sure to clean the bit and hole often, as woodchips will build up quickly.

TAB Install Step 3

Clean out sawdust by blowing through a piece of tubing or using compressed air. Verify that your 13/16” hole is a full 5-3/4” deep.

TAB Install Step 4

Screw in the TF TAB until the boss is seated.

Allowing for Tree Movement

Tree MovementTree Movement

Important Note:

When building a treehouse that involves more than one tree, you must allow for independent tree movement and must never fix the trees together with beams or structural components. Our hardware has been designed to allow beams to safely connect to more than one tree, all while allowing movement.

Tree Fort Working LoadTree Fort Working Load

Treehouse Example Platforms

Example Treehouse PlatformsExample Treehouse Platforms