How to Install? (For details, please refer to the manual)
1. Take out the semicircular angle board, align two holes on the angle board with two holes on the worktable, and tighten them with screws.
2. Take out the L-type stainless steel square pipe support, and align two holes on the pillar with two holes on the angle board. Put on the bolt, cover the copper nose (copper nose is conductive zero line, and very important), and tighten the nut.
3. Pull out the heating wire about 30cm/11.81in from the wire wheel.
4. Thread the heating wire through the small hole of the worktable, and then make a ring on the heating wire and hang it on the spring at the machines bottom. It should not fall off.
5. Rotate the aluminum alloy wire wheel on the bracket to tighten the heating wire. The heating wire is moderately tight and naturally elastic.