[25mm]
[31mm]
Using Sequence:
1)Use #8,#10 SS file to negotiate the canal.
2)Use #12,#15,#19 M-Pat to set up a smooth path.
3)Use 30,8% orifice to pre-enlarge the upper canal.
4)Use 20,4%(Yellow),25,4%(Red),30,4%(blue) to prepare to working length.
5)Make sure rinse the canal by nacio,use the #15 to break the debris and then lubricate the canal with EDTA every time changing the files.
6)Use larger size files to finish the preparation depands on the anatomy.
Packing List:
5 files per pack